- Joined
- Feb 11, 2007
- Messages
- 17,547
Thanks for posting Doc. I agree it may well be queue stuff. It sure is making my June trip planning confusing. I hope I dont have to change a bunch of stuff right before we leave.
I think it is too early to worry about xPASS messing with plans. They'd have to reach critical mass before doing anything with it, and so far this is only two attractions.
"Plusing" as with the Winnie The Pooh attraction? Is Peter Pan getting the same thing?
Yes WtP, Haunted Mansion, Soarin' and Space Mountain all could be considered to have NextGen plussed queues (Soarin' being a very early version).
I know Peter Pan is going to get some queue work once they open the new bathrooms where the skyway building was (and probably the bulk of it after some parts of FLE are open), but I've not heard much other than just re-working the queue, probably for capacity (get more guests out from lining up on the pathway). There could be some elements added though.