Pixiedust34
<font color=blue>It's like I'm stuck in a music ti
- Joined
- Jun 23, 2005
- Messages
- 9,649
It's already in the testing stages, so at least at the MK I don't think it will take too long. Perhaps it'll start there and roll over to the other parks shortly after?
Eventually, I think everything will be scanned for access (resort doors--AoA is already set up for this, refillable mugs, pool access, etc.) and it will take a while for all of the systems to be converted, especially the resort's room doors.
Eventually, I think everything will be scanned for access (resort doors--AoA is already set up for this, refillable mugs, pool access, etc.) and it will take a while for all of the systems to be converted, especially the resort's room doors.