natebenma
Beach Club Dee
- Joined
- Jul 19, 2008
- Messages
- 20,143
Is there any construction going on at the BC/YC this fall or winter?
Not sure if the work on the siding will be still going on in the fall or winter. The construction crews are working on small sections of the resort at a time, so they are moving frequently and it is tough to predict where they will be showing up.
Most reports have been that it is not been bothersome to guests, but if you have a room affected by the work outside, you can go to the front desk to see if they are able to switch you to another room. If there is availability the folks at the front desk will do their best to make you happy.
In the winter, parts of the Stormalong Bay pool will undergo routine maintenance- From my understanding, usually 1/3 of the pool will be shut down at a time while work proceeds but the rest of the pool will be open.
I'm guessing that work on SAB does not start until January. Anyone know if that is a correct assumption?