Jcricket Fan
DIS Veteran
- Joined
- Apr 15, 2000
- Messages
- 892
We were at BCV from 1/19-1/28 and a lot of touch up work was being done. We had a letter slipped under the door letting us know they would be power washing near the balconies. Paint crews were painting the bridge near the walkway to the bus stops and the outside of the villas were being touched up also. We heard some early morning hammering one day but the maintanence never caused us any problems.
The walls in the hallways at the villas & near the shop at the Beach club were being painted as well.
Colleen
The walls in the hallways at the villas & near the shop at the Beach club were being painted as well.
Colleen