Resort Thread Disney's GRAND FLORIDIAN Resort & Spa + Construction Updates!!

I’m here now and everything is great! I will post more info and pics (probably not until after my trip), but wanted to pop on and see if anyone had any questions while I’m still here? We are much busier this trip than usual but I will try my best to pop back on and see if anyone needs anything!
 
I’m here now and everything is great! I will post more info and pics (probably not until after my trip), but wanted to pop on and see if anyone had any questions while I’m still here? We are much busier this trip than usual but I will try my best to pop back on and see if anyone needs anything!


Glad you’re having a great trip! Hope you get some time to relax tho. 😂
 
I’m here now and everything is great! I will post more info and pics (probably not until after my trip), but wanted to pop on and see if anyone had any questions while I’m still here? We are much busier this trip than usual but I will try my best to pop back on and see if anyone needs anything!
Any pictures of construction, or anything you think we need to see that hasn’t been noted, would be great! Thanks and hope you’re having a great time!
 

Grand Floridian Lobby Reimagining Update: Staircase Unveiled, New Wallpaper, Birdcage Bar Theming, and More

Disney’s Grand Floridian Resort has been a construction zone for months as Disney works to reimagine the space, but we’re starting to turn a corner and see some projects wrap up. During a recent visit to Magic Kingdom, we stopped by the Grand Floridian to get an updated look at the latest work, including some areas that are now complete. Here’s a look around!


The Grand (Staircase) Reveal​

Early last month, we brought you a first look at a new mural that would preside over the grand staircase. Now, work has wrapped up on not only the new mural, but also a recarpeting of the staircase to give it a fresh new look.

grand-floridian-lobby-new-staircase-09302025-2-2048x1366.jpg

grand-floridian-lobby-new-staircase-09302025-3-2048x1366.jpg


grand-floridian-lobby-new-staircase-09302025-5-2048x1366.jpg
grand-floridian-lobby-new-staircase-09302025-6-2048x1366.jpg



Wallpaper Upgrades​

One aspect of the project that has gone a little bit under the radar is the wallpaper upgrades taking place throughout the lobby area. First, here’s a look back at the old wallpaper design. Vertical lines were prevalent throughout the lobby, but they have been replaced.

grand-floridian-lobby-refurbishment-06112025-3-2048x1366.jpg

We’ll start with a look at the elevator foyer areas. The photos below are of the second-floor elevator bank area. As you can see, the vertical line wallpaper has been replaced with designs that feature tree branches and birds. This wallpaper is similar to the wallpaper that you’ll find in the other Grand Floridian campus-style buildings.


grand-floridian-lobby-elevator-area-wallpaper-09302025-1-2048x1366.jpg




grand-floridian-lobby-elevator-area-wallpaper-09302025-4-2048x1366.jpg

Other wallpaper updates include the transition areas between the first-floor main entrance and the monorail egress. Here’s a look at that wallpaper design.


Elegant hotel lobby entrance with glass sliding doors, ornate wall patterns, and plush welcome mats featuring the Disney logo, creating a luxurious Disney resort atmosphere.
grand-floridian-lobby-egress-wallpaper-09302025-1-2048x1366.jpg


grand-floridian-lobby-egress-wallpaper-09302025-3-2048x1366.jpg

Bell Services & Check-In Areas​

The Bell Services area has relocated to the “left” side of the lobby as it relates to the main entrance from the porte cochere. This area was previously underutilized, at least in recent years.

grand-floridian-lobby-bell-services-09302025-2-2048x1366.jpg

grand-floridian-lobby-bell-services-09302025-3-2048x1366.jpg
grand-floridian-lobby-bell-services-09302025-4-2048x1366.jpg


grand-floridian-lobby-bell-services-09302025-1-2048x1366.jpg

Construction continues on the main check-in area. As we can see, there is still work to be done on the desks, while new lighting fixtures and wallpaper have been installed. Construction walls have been removed from this area, and only curtains are in place right now. To me, that suggests that this area will open soon.


White hotel conference room with partition curtains and elegant lighting fixtures, showcasing a spacious and luxurious event space.
grand-floridian-lobby-check-in-desks-construction-09302025-2-2048x1366.jpg


Elegant gold modern chandelier with spherical lights hanging from a gold rectangular ceiling mount.
Elegant modern chandelier with gold hoops and white glass globes hanging indoors at a Disney-themed location.
Elegant chandelier with gold rings and white glass globes hanging from a ceiling, with a decorative wooden wall featuring a monogram and floral design, in a luxurious interior setting.


Elegant chandelier with gold rings and white globes hanging in a stylish interior space.
Elegant window with scalloped arch and patterned curtains in a bright, neutral room at Disney World.
grand-floridian-lobby-check-in-desks-construction-09302025-8-2048x1366.jpg


Birdcage Bar Update​

Last, but not least, we have an updated look at the lobby birdcage bar, which is making some wonderful progress. More than just a skeleton frame, the birdcage bar now has theming elements, including some wood grain panels that give it a warm, elevated look. Here are a number of photos of the bar from different angles around the lobby.

grand-floridian-lobby-birdcage-bar-construction-09302025-1-2048x1366.jpg

grand-floridian-lobby-birdcage-bar-construction-09302025-2-2048x1366.jpg
grand-floridian-lobby-birdcage-bar-construction-09302025-3-2048x1366.jpg
grand-floridian-lobby-birdcage-bar-construction-09302025-4-2048x1366.jpg


grand-floridian-lobby-birdcage-bar-construction-09302025-6-2048x1152.jpg
grand-floridian-lobby-birdcage-bar-construction-09302025-5-2048x1366.jpg
grand-floridian-lobby-birdcage-bar-construction-09302025-7-2048x1366.jpg


grand-floridian-lobby-birdcage-bar-construction-09302025-8-2048x1366.jpg
grand-floridian-lobby-birdcage-bar-construction-09302025-9-2048x1366.jpg
grand-floridian-lobby-birdcage-bar-construction-09302025-12-2048x1366.jpg


grand-floridian-lobby-birdcage-bar-construction-09302025-11-2048x1366.jpg
Newly construction of a themed Disney bar area with Disney employees working on furniture and decor.

As a reminder, here’s the previously released concept art for the Grand Floridian lobby reimagining project. The work is expected to be completed early next year.
 
I am going to break up what would be a long post into multiple posts since I know myself well enough to know that I’ll never get it all typed in one sitting! I will start with construction photos first. I don’t think mine offer any additional detail besides what has already been posted from other sources, but I know that some on this thread have a more discerning eye for subtle differences so I will post them just in case they interest anyone.

Mon, Tues, and today (Wed) were very noisy starting around 9:30 am. Not sure how long the noise lasted as we left around 10:30 each day. The noise sounded like drilling. There was no noise in the evenings, and we did spend a lot of time at the lounge. Our rooms were on the second floor far from the lobby so I can’t say for sure whether noise was audible from the rooms around the atrium. On Friday and today we were in then lounge at midday and there was no noise at that time, either.

All photos except the first one of the check in desks (yesterday) are from today. Garden View Tea Room has had a lot going on. Birdcage elevator has been being painted. Lots of work being done on the bar but I didn’t try to discern exactly what.
 

Attachments

  • IMG_2752.jpeg
    IMG_2752.jpeg
    93.6 KB · Views: 1
  • IMG_2834.jpeg
    IMG_2834.jpeg
    195.6 KB · Views: 1
  • IMG_2833.jpeg
    IMG_2833.jpeg
    172.4 KB · Views: 1
  • IMG_2832.jpeg
    IMG_2832.jpeg
    122.3 KB · Views: 1
  • IMG_2831.jpeg
    IMG_2831.jpeg
    168.4 KB · Views: 1
  • IMG_2830.jpeg
    IMG_2830.jpeg
    155.4 KB · Views: 1
I am going to break up what would be a long post into multiple posts since I know myself well enough to know that I’ll never get it all typed in one sitting! I will start with construction photos first. I don’t think mine offer any additional detail besides what has already been posted from other sources, but I know that some on this thread have a more discerning eye for subtle differences so I will post them just in case they interest anyone.

Mon, Tues, and today (Wed) were very noisy starting around 9:30 am. Not sure how long the noise lasted as we left around 10:30 each day. The noise sounded like drilling. There was no noise in the evenings, and we did spend a lot of time at the lounge. Our rooms were on the second floor far from the lobby so I can’t say for sure whether noise was audible from the rooms around the atrium. On Friday and today we were in then lounge at midday and there was no noise at that time, either.

All photos except the first one of the check in desks (yesterday) are from today. Garden View Tea Room has had a lot going on. Birdcage elevator has been being painted. Lots of work being done on the bar but I didn’t try to discern exactly what.
Thank you so much for sharing! Hope you had a great trip!
 


Receive up to $1,000 in Onboard Credit and a Gift Basket!
That’s right — when you book your Disney Cruise with Dreams Unlimited Travel, you’ll receive incredible shipboard credits to spend during your vacation!
CLICK HERE


New Posts







DIS Facebook DIS youtube DIS Instagram DIS Pinterest DIS Tiktok DIS Twitter DIS Bluesky

Back
Top Bottom