Testing trains on BTMRR - open soon?

MommaBerd

DIS Veteran
Joined
Jul 5, 2011
Messages
3,217
I'm in line for HM and they are running trains on BTMRR. Does this mean it could soft open before Saturday?!?!
 
Anything is possible.
But, they have been known to test long before an attraction (re)opens.

The best you can hope for is to just keep checking.
 
when pirates soft opened it was almost a week of suddenly letting a few people in to ride but not fully opened for anyone to walk in. once the walls come down and there is cast members watching the entrance then some type of opening is very close.

I don't think it's going to be quick testing, it looked like they replaced a section of track and a bridge to me and that is probably going to be extensively tested and possibly even the really slow going finger test or whatever it's officially called.
 
Don't expect anything to open early just because it is testing. It is a good sign they are testing things but they have to test the ride when work has been done. I am not expecting this to open early. I think this will open right as scheduled.
 

I asked a CM outside of the ride and he said that when the walls to the entrance come down (which they weren't) THEN it would be close. But they expected to open on schedule.
 


Disney Vacation Planning. Free. Done for You.
Our Authorized Disney Vacation Planners are here to provide personalized, expert advice, answer every question, and uncover the best discounts. Let Dreams Unlimited Travel take care of all the details, so you can sit back, relax, and enjoy a stress-free vacation.
Start Your Disney Vacation
Disney EarMarked Producer

New Posts







DIS Facebook DIS youtube DIS Instagram DIS Pinterest DIS Tiktok DIS Twitter
Add as a preferred source on Google

Back
Top Bottom