I meant to post this picture when I posted the others but forgot. I'm assuming this will be the loading station...or part of it:
That's actually the new stage. The loading station is next to BMG.
I meant to post this picture when I posted the others but forgot. I'm assuming this will be the loading station...or part of it:
Ah OK...I didn't know what it was.That's actually the new stage. The loading station is next to BMG.
Want to take a simulation ride?Screamscape has got it on youtube.
Here is the website,scroll down alittle and click on the youtube:
http://www.screamscape.com/html/universal_studios_florida.htm
The giant loop looks WONDERFUL!
You mean this view?![]()
![]()
This is what we saw on last Wed when we were there and DH goes "Wow that is steep and if was open now you can go clear to space". I told him he can go on it himself I dont do loopy loops. LOL. It does look like a pretty amzaing though and should be a hit when it is opened.
The stage they are building looks awesome too it is about time they built a permanent stage there instead of down and putting it up constantly.
ETA: While driving down Turkey Lake going to Universal we saw the rest of the track for the coaster laying where all the construction vehicles and offices are. (Where the old entrance for the park used to be).
Want to take a simulation ride?Screamscape has got it on youtube.
Here is the website,scroll down alittle and click on the youtube:
http://www.screamscape.com/html/universal_studios_florida.htm
Boy I hope this is open in April when we get there!!!![]()