disneymagic02 Mouseketeer Joined Jun 5, 2005 Messages 352 Sep 25, 2005 #1 Can anyone tell me when the construction will be done on the train station? Thanks!
K kaytieeldr DIS Legend Joined Jun 11, 2005 Messages 51,313 Sep 25, 2005 #3 Check www.allearsnet.com, www.mousesavers.com or even (possibly) www.disneyworld.com for rehab schedules.
Check www.allearsnet.com, www.mousesavers.com or even (possibly) www.disneyworld.com for rehab schedules.
VSL I know it's all corporate/business... but it's sti Joined May 3, 2005 Messages 2,075 Sep 26, 2005 #5 I can't remember where I read it (how irritating is that?!), but I think sometime around Dec 20.
S safetymom dis veteran Joined Aug 13, 2001 Messages 41,086 Sep 26, 2005 #6 The sidewalk in front of the station is supposed to be done the first week of Oct. They will be shifting the walls to work on the ofther side of the station and that should be done by December sometime.
The sidewalk in front of the station is supposed to be done the first week of Oct. They will be shifting the walls to work on the ofther side of the station and that should be done by December sometime.