lockedoutlogic
DIS Legend
- Joined
- Apr 26, 2007
- Messages
- 15,781
So what you're giving is a scientific explanation (thank you) to why this app shows ZERO intention to build a connector to anything...even with that "deluxe location"Although not a construction permit, the application for this permit does have to include all proposed structures and impervious areas (i.e. those areas that are not natural ground and prevent water from being absorbed into the ground) in order to demonstrate that the stormwater calculations and proposed pond sites adequately meet the requirements for treatment and storage. That means that the plan would have to show the foundation for any bridge, any paved paths, sidewalks, roads, buildings, parking lots, pools, or other improvements, if they are planned as part of the project. It would also have to show any alterations to the existing ponds (which it does) or canals, which are part of the system. This is not to say that there will not be a "Phase II" part of the project, but it is pretty standard for Disney and RCID to have these projects as a single entity, which is put out to bid by a contractor to handle the job in its entirety, rather than piece-mealing a project.
Now back to regular programming