The soft refurb was done because they were also selling the new rooms at the same time... I think they may have been delayed if not for that...I am hopeful they stick with the timeline because the soft refurb was done pretty close to the determined schedule considering the shutdowns in 2020.
Resort studios being identical to cash rooms also makes me think they will 100% be refurbished on that schedule and they share materials across the buildings. The new hallway carpeting in all the buildings is the same material as the area rugs in the 1/2-bedrooms. I know they're on a different hard/soft schedule, but I can see them wanting to keep costs down by sharing as much as possible.
Everyone says they are on a 7/14 schedule, but it feels to me many hotels don't stick with that schedule.