STLstone
DIS Veteran
- Joined
- Apr 8, 2016
- Messages
- 682
Another thing we lose with this project is how it would have added more square footage of walkways to the park. I know they can still open the shortcut for big crowds, but this would have made that path a permanent part of the park.
I'm not one that loves going to see those plays, but this would have been a great overall addition to the park. Of all the D23 announcements, this probably wasn't even in my Top 5 things I was looking forward to, but I'm pretty bummed.
ETA: Since this post, it has been explained that the path connection I describe was not really part of this project.
I'm not one that loves going to see those plays, but this would have been a great overall addition to the park. Of all the D23 announcements, this probably wasn't even in my Top 5 things I was looking forward to, but I'm pretty bummed.
ETA: Since this post, it has been explained that the path connection I describe was not really part of this project.
Last edited: