Didn't authorize overtime. Didn't properly estimate how long construction would take. Should have taken fewer rooms out of service and scheduled more time.I’m confused how it’s DVCs fault that the construction didn’t get finished
Member services tried to tell me Yacht Club was a better resort. I thinks it’s their logic to not refund the points. I explained that I have been a BW owner since 1997 and in my opinion there is no better resort in WDW. And a 1-bedroom is not the same as a studio.I agree - not unfair for them to have to give you a studio, but totally unfair to not refund the difference between a studio and a 1-bedroom. A studio at YC is NOT equivalent to a 1-bedroom at BW. Good luck!
I hope they finally agreed to give you the points back. The person I spoke to said that if they would have had to give me standard view studio instead of a boardwalk view studio, they would have refunded the difference in points. the difference between a room at the Yacht Club and a 1 bedroom at BWV is very different. I actually think I was downgraded since no longer had a water view. Not the same experience.Member services tried to tell me Yacht Club was a better resort. I thinks it’s their logic to not refund the points. I explained that I have been a BW owner since 1997 and in my opinion there is no better resort in WDW. And a 1-bedroom is not the same as a studio.
Good grief. It's outside of the DVC system and an exchange requires more points. It's not better because it requires more points.Member services tried to tell me Yacht Club was a better resort. I thinks it’s their logic to not refund the points. I explained that I have been a BW owner since 1997 and in my opinion there is no better resort in WDW. And a 1-bedroom is not the same as a studio.

I don't care which resort it is, a one bedroom with the kitchen and laundry is way different than a big room with two beds.Member services tried to tell me Yacht Club was a better resort. I thinks it’s their logic to not refund the points. I explained that I have been a BW owner since 1997 and in my opinion there is no better resort in WDW. And a 1-bedroom is not the same as a studio.
While I agree that the OP should have points refunded, I do not blame DVC for the delay.Didn't authorize overtime. Didn't properly estimate how long construction would take. Should have taken fewer rooms out of service and scheduled more time.
Fewer rooms out at one time makes it less likely rooms won't be back in inventory when projected.Taking fewer rooms out wouldn’t have made a difference. You’d just be impacting fewer guests at a time, since those rooms are likely fully booked for the duration of the renovations.
How much more time do you think they should have scheduled? How do you know they didn’t?
It’s not their fault, but it is their responsibility.I’m confused how it’s DVCs fault that the construction didn’t get finished
Catch 22 though because if they had put off the renovations until 2024 people would continue to be upset.
These things happen and while disappointing someone has to be moved, can’t say I agree that DVC can control delays or that they didn’t on purpose.
I am sure I will get criticized but this isn’t Disney…it’s DVC and when things happen to take rooms out of service, it’s on the association to figure it out and that is us as owners.
The only part that isn’t right is not refunding the owner extra points and I bet that was misinformation and that they will indeed get those back.
I agree. If this was one night I would be less upset. We are staying 3 nights and had planned on using the kitchen as we often do. I understand things can happen to a room and with the resort at full capacity it’s unavoidable. As of today still no resolution on the point issue. All I’m asking is for the difference from a 1 bed to a studio. Not trying to get it for free. I think that’s fair.Bear with me for this long winded story but it is semi-relevant! Back in May my sister and I booked a last minute 1-bdr Savanna view at Kidani and unfortunately when we arrived the room had a really intense and horrible burnt plastic and bacon smell throughout. We opened both balconies and just sat out there for over an hour hoping the smell would dissipate, but it never did.
It started making me really nauseous and we decided to call down to mousekeeping to see if they could at least come give the space another cleaning, maybe that would help but when we got on the phone the front desk apologized profusely and said they’d call us back with a solution. About 10 mins later a lovely woman who introduced herself as one of the managers at AKL again, apologized and offered to move us to a Jambo studio hotel-side since that was all they had for the night if we didn’t want to stay in that room. There was no argument, no pushback, no “let’s try this first before taking other measures” just a sincere apology and let me fix this the best way I can.
We didn’t really mind since it was only 1 night and just the two of us but I mentioned that our room cost us X pts (I don’t remember how much off the top of my head right now) and if it was possible to get some of our points back since we were technically “downgrading” (although the hotel-side rooms are so much nicer than the current state of the villas I’m not sure if it’s fair to call it a downgrade but I digress!)
She said she’d have to get back to me and again called 10 mins later and said she couldn’t cover the whole value but could offer us 25 points back for the inconvenience, of course we accepted- we were expecting less tbh.
All this to say, they can definitely return points if they down grade you and/or if they put you in a non-DVC hotel/rooms. And further, they absolutely should return your share of points I can’t even believe they’re out right refusing. We got some points back and we weren’t half as inconvenienced as you are currently.
I will say speaking to the manager might have helped. I’m not sure if you’ve been able to speak to one at BW but she had the power to make decisions the regular castmates at the front desk couldn’t. And I know we only had 1 night for them to contend so maybe we got lucky but that shouldn’t matter. Like others have said, keeping calling them and demanding to speak to the higher up’s!
Good luck and I hope you get the best solution for your situation as possible!
Absolutely fair to reimburse you some of the points if they cannot provide equivalent or better than you had booked. To be fair, you’re still not even getting a studio. You’re going to a standard cash room on non-DVC Yacht club side correct? I know factually that rooms not shown online as available for both DVC & Cash exist. They need to do better and make a fair & equitable gesture for your inconvenience. Escalate thru Member Services as far up the chain as possible! Boardwalk as a general rule is the least accommodating with room requests, transfers, etc.I agree. If this was one night I would be less upset. We are staying 3 nights and had planned on using the kitchen as we often do. I understand things can happen to a room and with the resort at full capacity it’s unavoidable. As of today still no resolution on the point issue. All I’m asking is for the difference from a 1 bed to a studio. Not trying to get it for free. I think that’s fair.