TaraPA
Can't live without a ticker!!!!
- Joined
- Sep 6, 2000
- Messages
- 16,570
Just back from another FABULOUS stay at Poly. The construction didn't bother us at all. As of yesterday afternoon there was no visible construction inside or outside of GCH. Lots of construction on the beach, and the bungalows have walls up. A crane was lifting the roof of each bungalow into place as we left. The monorail being down from 11:30-7 wasn't an issue for us, the bus, boat & TTC modes of transportation worked out just fine.
No issues with the Rapid Refill mug system. Kona & Ohana were great.
We requested Tokelau, facing quiet pool, and got Samoa facing the Volcano pool, which we found out we loved even better! The grounds were breathtaking as always. It will be so sad to see the changes inside the GCH, hoping they do some sort of water feature in there again.
No issues with the Rapid Refill mug system. Kona & Ohana were great.
We requested Tokelau, facing quiet pool, and got Samoa facing the Volcano pool, which we found out we loved even better! The grounds were breathtaking as always. It will be so sad to see the changes inside the GCH, hoping they do some sort of water feature in there again.