Yes, thank you, I did but maybe I am missing something because I can't find if EVERYTHING will be done by the end of September...
Quote "The WL room rehab includes replacement of most bathroom fixtures including the tile and shower curtain, the flooring, drapery, bedding and fabric areas of existing furniture, including the headboard. The outdoor furniture will also be replaced and the room painted a lighter color. All hallway carpeting will also be replaced.
To ensure minimal disruption to guests, the rehab will use floor buffering, meaning, the floor beneath the wing being rehabbed will not be occupied by guests.
From July 7 - 27, the South Wing's 7th (CL) floor is being rehabbed. The CL floor will have to be closed from about July 7 - 13 due to the replacement of carpeting, etc... near the lounge which will have to be closed.
The entire WL room rehab is slated to be completed by the end of September 2012."
So, are they doing any construction to the main public areas?