Darcy03231
DIS Legend
- Joined
- Nov 1, 2006
- Messages
- 11,237
We did two using a local small contractor. We gutted them both and replaced all of the plumbing, but didn't move anything, other than the mini-tub in the master bathroom because a custom tiled shower. We spent $4,000 on one and $5,000 on the other. The contractor allowed us to buy our own tile, vanities, etc. He just told us how much to get for the tile and the sizes we had to stay within for the vanities and toilets.