senecabeach
Have a Disney Day !!!
- Joined
- Oct 26, 2003
- Messages
- 13,202


I was in an Ocean View Inn Room last week and returned home to snowy Maine late Saturday. They had opened the beach access Saturday morning from a temporary access beyond building 15. It opened at 8am just an hour before high tide and there was no room to walk with your toes in the water because of a huge cliff like plateau of sand that had been built up for beach sand replenishment two stories high. The cabanas were placed atop this plateau with a huge drop off to the surf below. Sorry I didn't get a photo. Also, during the week while the beach was closed, construction began on the main building on the entire end facing the pool which included lots of banging and clanging as 4 story scaffolding was erected and workers spent a lot of time watching the pool activity. It took away from the atmosphere in a very big way! I had gotten a letter about the beach closure, but the letter did not mention this double whammy affront to my resort enjoyment.
I am interested in hearing a bit more about the BBQ grills. Where are they exactly at the resort? Are they in high demand? Easy to reserve?
Separately, you know what would be really great for this thread? Some pictures of the rooms in the first post. I know that most of this info has been transferred over from previous threads, but much of the info is only links. Some pictures would be greatly appreciated! I promise to help by taking some pictures of our one bedroom room and posting them when we get home mid-March.
Not sure how long it will take or what they are doing, but they did go to the extra trouble of adding scrim to the scaffolding that matches the color of the building. Putting up all that scaffolding took 3 full days and was likely the noisiest part of the project. Perhaps a call to the resort would be a good way to find out.Any idea on how long the construction on the main building is supposed to take?
Not sure how long it will take or what they are doing, but they did go to the extra trouble of adding scrim to the scaffolding that matches the color of the building. Putting up all that scaffolding took 3 full days and was likely the noisiest part of the project. Perhaps a call to the resort would be a good way to find out.
I like the full size images. Very easy to read. Thanks so much for this great information!Which works better full size image or thumbnail image? please let me know