I venture to guess that everyone here realizes rides can breakdown suddenly. That's not what is going on with ToT right now. These are not sides breaking down on rare instances
My point is the time of which both sides were running since 2019 refurb (not counting the park closure) is minimal.
Going back to when we started going every few months in 2011 to the 2019 work, all 4 sides ran most days, short of a temp breakdown
Something is up that is out of the ordinary for them to have to have worked on some part of the 4 elevators since 2019, short of a very brief time when they all operated last fall