jdg345
DIS Veteran
- Joined
- Jun 1, 2006
- Messages
- 2,106
Sammie said:I think the Contemporary project was delayed due to cost. I don't think it is out of the possiblity yet. I was told when AKL was built that infrastructure for DVC was laid. I would guess that would be mean the area for the new lodge.
I was told this summer it will lie to the left of the Lodge where that dead end cove is in the drive up to the Lodge.
I was also told that SSR is selling very quickly and something quick was needed to keep the momentum going. Contemporary would be a slow going project to build.
I think it might also have something to do with Florida Law and how they are allowed to sell things like this. Since AKL is existing and they are going to remodel some rooms, it might be easier to get this rolling than CRV (which would require lots of demo, etc).
Just a hunch, but my bet was always VAKL first, then CRV. There was a rumor awhile back that CRV had been green-lighted, but would not be the next DVC annouced. Woohoo!