DinahInWonderland
Mouseketeer
- Joined
- Apr 17, 2007
- Messages
- 281
My family is book for a week at VWL at the beginning of October. We switched over from BLT at our 7 month window so we could have the extra space of a 2 bedroom villa for less points. I knew the construction was going to be ongoing when we booked but the newest pictures have my husband concerned that the resort is going to be more of a mess than we had anticipated.
I know a lot can be done in a 6.5 month period and construction might not be as drastic as we are seeing now by then. Has anyone come across a timetable for when some of the stages of this project might be completed?
I know a lot can be done in a 6.5 month period and construction might not be as drastic as we are seeing now by then. Has anyone come across a timetable for when some of the stages of this project might be completed?
