System type Cost/Year Info Source System Status
Hitachi
$15 million/km
1964
Tokyo-Haneda Monorail
Operating
Hitachi
$62 million/km
1985
Kitakyushu Monorail
Operating
VSL-
(refurbished Mark IV trains)
$25 million/mile
1995
MGM-Bally's Monorail
Replaced with Bombardier system
Hitachi
$27 million/km
$44 million/mile
2003
Okinawa Monorail
Operating
Kuala Lumpur
MTrans
$36 million/km
2003
Kuala Lumpur Monorail
Operating
Bombardier MVI
$88 million/mile
2004
Las Vegas Monorail
(7 stations/4 miles)
Operating
Hitachi$73.4 million/km
2006Palm Jumeirah MonorailOperating
Metrail
$20 million/km
2008
Metrail
Contracted
Scomi
$27.25 million/km
2008
Mumbai Monorail
(Rites Ltd.)
Operating (2014)
Not much good without full disclosure that this is from a
site set up by an organization that promotes monorail use.
You could go to the other extreme, of course, and use a
table set up by an organization that promotes light rail.
Table 1.
Urban Monorails:
System installation Cost
Cost per Mile ($ Millions, 2002)
Chiba (Japan): Monorail (extension) 128.2
Jacksonville: Skyway (new) 81.1
Kitakyushu (Japan): Monorail (new) 205.9
Kuala Lumpur (Malaysia) (new) 58.2
Las Vegas (LVMC Project, new) 166.7
Newark: Monorail AGT (new) 223.1
Okinawa (Japan): Monorail (new) 103.9
Average: 138.2
[Sources: Capital Metro, Rapid Transit Project, ADraft B Milestone 2 Executive Summary: Urban Transit Vehicles@, 1 October 2001; Steve Arrington, Jacksonville Transportation Authority, 12 October 2001; Leroy Demery, Jr., May 2002; Monorail Malaysia, news release, 23 April 2001; Jacob Snow, AThe Las Vegas Monorail@, Monorail Society website, 2002/11/02. Calculations by LRP]
Or you could use the more reasonable estimates I have provided previously.