I wouldn't count on an official openining until the fall. Word on the street has it that they are behind schedule and have some technical problems with the ride system that they need to iron out before the ride can be handed over to operations. A ride of this magnitude will likely have an extended preview period after that happens, because they will want it to be 100% working for the press events to avoid another Test Track backlash.