have been digging for the last 2 weekends and the odd night,for the factualy minded of you i removed 15 cubic metres from the ground.
Reason why we have had to pile as ground is poor,so you only have to go down 700mm below damp then plile and ring beam it,its 2.8 metrers out 12 metres along the back and 6 metres down the side.have had to go throught the patio i put in removed pavings and had to go througth screed concrete and mot.
Worst thing about work below ground it never gets seen and its hard work,next after concrete tomorow or thursday. i have to revove soil and rubble from center area stone up then poor a slab
Paulh