bookbabe626
DIS Veteran
- Joined
- Aug 25, 2006
- Messages
- 2,127
Has there been any new construction at the IG from BC/YC? I love the convenience of walking through that entrance I worry the Skyline will disrupt that flow. Is it still two turnstiles and two security? Also is all the cabana construction done at Yacht Club?
Cabana construction is done and the cabanas are in use.
The IG has lots of construction walls, and things are rearranged. There’s a temporary security station just before you get to guest relations, with two tables and a metal detector. Then you follow a narrow pathway behind guest relations and the ticket scan points are on the path just past the first entrance to the store. Sorry I didn’t take a pic, but maybe @YCFAN or @focusondisney can take a pic if they’re still there.



Would be SO much easier if we all stayed same dates but I'm caught in the middle and have to do what I can
So looks like I'll be staying from 10/18-10/29/19 unless I can get my daughter a reservation for 10/20-10/24/19. Looking for any pixie dust anyone can give!