After 6 wonderful nights at VWL we are heading home very early tomorrow morning. We had a fantastic trip with great weather, lots of yummy food (Boma tonight was delicious) and priceless memories. Our first trip to the lodge was last October during the pool construction and while we had a great trip and the construction really didn't bother us, now I truly know what we were missing. This year we came back to the resort almost every afternoon so my boys ages 2 & 4 could enjoy the pool. They both loved the new kids area which they did such a great job designing, and my 4 year old had the time of his life on the "big" water slide in the main pool which he must have rode literally a hundred times.
As for construction update, there really is not much to report, the scaffolding is still on the south side near the walkway to the villas. In all my time here, and as I mentioned before we came back most afternoons, I only heard noise from the scaffolding one time and it had zero impact on our trip. There are still no construction walls up for the big project starting in a couple weeks. I could not see any real prep work going on either as the beach is still open and no visible construction roads. I did not have a chance to walk around the north side of the property since we stayed at the villas, so I may have missed something over there.
On the monorail yesterday I could see on the north edge of the lodge property 2 pickup trucks by the lake that looked to be some site surveyors. But that is purely a guess as they might have been doing something else, but was really the only thing I saw.
Thanks again for this great thread Kook, I am a daily reader even though I don't post often. I am definitely going to miss this place as I think next time we may try the poly or bay lake tower.