I'm sure other people will disagree, but I am confident that every issue discussed in this thread was discussed in detail between Disney and Doppelmayr before the contract was signed.
Think of it this way: Would the bean counters at Disney sign off on any major project without researching every potential problem?
This also isn't Doppelmayr's first rodeo. They've literally installed over 15,000 ropeway systems in a wide variety of climates. Some of their lines are hundreds of feet in the air and cross foreboding terrain. And they have also installed lines in urban areas that must meet stringent regulations in terms of access for wheelchairs and things like ECVs.
Think of it this way: Would the bean counters at Disney sign off on any major project without researching every potential problem?
This also isn't Doppelmayr's first rodeo. They've literally installed over 15,000 ropeway systems in a wide variety of climates. Some of their lines are hundreds of feet in the air and cross foreboding terrain. And they have also installed lines in urban areas that must meet stringent regulations in terms of access for wheelchairs and things like ECVs.