sachilles
DVC coming to this space soon
- Joined
- Jan 7, 2013
- Messages
- 2,541
I suspect the current alignment is accounting for stations we do not currently know are in the plan.
Reason for that supposition is this:
If you connected the Boardwalk turn station to DHS instead of the CBR tower(north). Your travel distance from Epcot to CBR south would be shorter, and therefore cheaper. Your connection from either CBR location to DHS would be unchanged. Your connection from epcot to DHS would be shorter.
With the currently believed lines it is shorter ride to epcot for someone in the CBR tower to epcot. I see that as the only benefit of that alignment to a guest at the CBR tower.
So this presumes that price for the project has a consistent per mile price. It also presumes there isn't some hidden cost, with the direct boardwalk to dhs connection that we are not privy to making this the most financially prudent route.
So they either value the occupants desires in the CBR tower(plausible if it's a DVC), over the cost savings of a more efficient route. Or the routes they have chosen line up with other unknown parts of the project we've yet to figure out.
Reason for that supposition is this:
If you connected the Boardwalk turn station to DHS instead of the CBR tower(north). Your travel distance from Epcot to CBR south would be shorter, and therefore cheaper. Your connection from either CBR location to DHS would be unchanged. Your connection from epcot to DHS would be shorter.
With the currently believed lines it is shorter ride to epcot for someone in the CBR tower to epcot. I see that as the only benefit of that alignment to a guest at the CBR tower.
So this presumes that price for the project has a consistent per mile price. It also presumes there isn't some hidden cost, with the direct boardwalk to dhs connection that we are not privy to making this the most financially prudent route.
So they either value the occupants desires in the CBR tower(plausible if it's a DVC), over the cost savings of a more efficient route. Or the routes they have chosen line up with other unknown parts of the project we've yet to figure out.