Additional elements of the project starting to become more visible...the beginnings of the porte cochere, lobby, and bus stop area. Original stormwater permit drawings showed six bus stops, some other plans have shown five. That's a seemingly decent size for a deluxe resort - similar sizing to AKL - and at least to me would seem appropriate for the potential guest load here. Original stormwater plans showed the bus stops as "proposed roof area" in orange in the image below, so presumably (and hopefully) these stops have some sort of roof structure along with a covered walkway from the lobby, which would make sense.
The grade leading to the porte cochere/main lobby entrance is "built up" - I believe you enter the building on the third floor.
Still very early in construction and inconclusive, but it seems to me that "hole" and steel now being erected in the lobby area could be the beginnings of the structural supports you see in original concept art in this area.