AZMermaid
DIS Veteran
- Joined
- Oct 28, 2006
- Messages
- 4,067
VGC resale timeline!
Offer accepted 4/3
Passed ROFR 5/11
Title Docs sent to us 6/5
Received title Docs 6/11
Sent back 6/12
Recorded on 6/15
Points were loaded into my DVC account 7/8 (maybe a few days earlier- I probably last checked 7/3)
Whole process- just over 3 months.
I have not received anything by mail yet and never called for my member number. I already owned one contract, so I already was in the system- although this is a different home resort and use year- so two separate contract numbers.
Good timing as I want to make a reservation for next summer on the 12th!
Offer accepted 4/3
Passed ROFR 5/11
Title Docs sent to us 6/5
Received title Docs 6/11
Sent back 6/12
Recorded on 6/15
Points were loaded into my DVC account 7/8 (maybe a few days earlier- I probably last checked 7/3)
Whole process- just over 3 months.
I have not received anything by mail yet and never called for my member number. I already owned one contract, so I already was in the system- although this is a different home resort and use year- so two separate contract numbers.
Good timing as I want to make a reservation for next summer on the 12th!