TheDailyMoo
DIS Veteran
- Joined
- Jun 9, 2021
- Messages
- 2,104
I'm looking at my pictures from last week and I see at least 4 guys standing on that same roof at the same time. That is definitely underlayment but the boards are in place. Full disclosure I am not a carpenter or home builder so I can't say for sure if they can do interior work without the shingles in place but if I were to guess I would say the electrical, plumbing, and walls are definitely being worked on. I assume it wouldn't take them very long to trim the interior if all that is done at the same time