AKV reservations...what did you get?????

Ah. I just got off the phone. The CM said her manager called back and they tool my information as to what my request is for room, dates, and view but they will have to call me back with a confirmation number when they can put it in the system.

How can they open it for reservations today and NOT have 2008 information in the system yet to be able to book? :mad:

Did she tell you that the reservation WAS made and only the confirmation # is needed? :confused3

I'm staying on hold, too, but the CM took my phone # "just in case we get disconnected...".:scared1:

:woohoo: :woohoo: The system's fixed! :dance3: :yay: :cheer2:
Got my confirmation # for savanna studio, Jan. 26-Feb.1 :yay: :yay:
 
We got what we wanted
On hold for quite a while due to the '08 mix-up
we got studio 1 night sept 28th
we goy studio 2 nights april 4th & 5th
both times savannah view
 
Finally! I got 2 Savannah View studio's for Nov 18th - 24th :cool1: . No Standard Views were available for my dates. As we were completing my transaction, the lady stated several times, "Oh my, these are really going fast!" :hourglass .

Good Luck, everyone!!!! :wizard:
 

Got my ressie :banana: 1BR Savannah View for mid-August '07.

Was on hold for over 25 minutes. Went through the 407 number, never could get through on the 800#

I thought AKVs would only be opening rooms in September?

Not that DH has any more vacation time left :rotfl2: just curious when DVCers can start staying there.
 
Did she tell you that the reservation WAS made and only the confirmation # is needed? :confused3

I'm staying on hold, too, but the CM took my phone # "just in case we get disconnected...".:scared1:

:woohoo: :woohoo: The system's fixed! :dance3: :yay: :cheer2:
Got my confirmation # for savanna studio, Jan. 26-Feb.1 :yay: :yay:
No. She said they couldn't get the system to work for 2008 because the info isn't there so she wrote down my info and said either her manager would call me with the confirmation or she would call me herself if she heard any news.

I'm afraid now that my info is on a piece of paper somewhere, never to be seen again... :( I've never had problems with MS before today so I trusted her when she said they'd call me back.
 
We got what we wanted...2 savannah view studios in September, 16 and 17th, and a standard view studio for December 8th...a Saturday night before VWL.

The first time I reached a person, the connection went bad, so I thought it would be a terrible morning. It took about 20 minutes from the dialing to getting a person the next time, but it went smoothly the second time.

Pixie dust to all!
Bobbi:wizard:
 
Savanna-view Studio, Nov 21-24.

Hey WithFaith50--we'll be there at the same time--I wonder how many studios are available, you don't think we took them all, do you? :scared1:

Okay, :idea: now I need to start thinking about April '08--man, this addiction is killing me!
 
No. She said they couldn't get the system to work for 2008 because the info isn't there so she wrote down my info and said either her manager would call me with the confirmation or she would call me herself if she heard any news.

I'm afraid now that my info is on a piece of paper somewhere, never to be seen again... :( I've never had problems with MS before today so I trusted her when she said they'd call me back.

Call back. System is fixed, they can check to see if it's been entered yet, and if not...can enter it for you. Just make sure you explain the whole situation and make sure that CM tells your "original" CM not to enter the ressie twice.
 
By the way, I know this is off topic :offtopic:, but for those who are interested AP Rates were released this morning for check-ins 6/3 - 8/4. Check the resort boards for more information.
 
Got mine!

Dec 16, 1-br, 5 nights

No problem getting the room. Got a busy signal until nearly 9:30, then on hold for about 15 minutes. No problem after that.
 
Got both of mine! 2 BR for October 19th in a savannah view and 2BR for Feb 5th-8th in a Savannah View!
 
I got in the hold queue at 9 after the hour. Now on the second run-through of the hold music. One hour in 5 minutes. Have not heard any voice telling me how long my wait might be -- other than the generic "longer than usual." I'm getting terribly discouraged. :sad1:
 
20 minutes from the time I started dialing (got several busy signals before I got in) until I just got off the phone having made my AKV reservations - 3 nights in a dedicated studio, savannah view, in October. Yay!!!
 
I thought AKVs would only be opening rooms in September?

Not that DH has any more vacation time left :rotfl2: just curious when DVCers can start staying there.
There are 7 dedicated studios and 7 2BR lockoffs opening some time in July. The only thing I'm not sure about is whether you need to own a Unit that is opening in July in order to use your AKV points to book prior to Sep 1st. (Units 41-45 are in the July 2007 phase, all other Units are in the Sep 2007 phase.)
 











New Posts





DIS Facebook DIS youtube DIS Instagram DIS Pinterest DIS Tiktok DIS Twitter

Back
Top