•The Official COPPER CREEK VILLAS & CABINS Owners & Lovers Group•

so excited to be two and a half months out from our first stay at CCV!! we've stayed at BRV before but this is our first time at CCV. planning dinner at Geyser Point night 1 and catching the electric water pageant. we own resale at SSR and direct at VGF, but hoping this trip will help me decide if I want to unload the SSR points and purchase CCV resale in its place.
 
so excited to be two and a half months out from our first stay at CCV!! we've stayed at BRV before but this is our first time at CCV. planning dinner at Geyser Point night 1 and catching the electric water pageant. we own resale at SSR and direct at VGF, but hoping this trip will help me decide if I want to unload the SSR points and purchase CCV resale in its place.
We own at VGF and CCV and love it. There is just something special about CCV, especially at the holidays. Let us know if you decide to buy into CCV. We wish we had more points there.
 
Someone posted a short video of the current construction on Facebook. Took a screenshot to share…

View attachment 1002935
Thanks for sharing. It's looking more likely that they will have moved over to the Copper Creek section by the time I'm there in November 😩. It's really hard to stay somewhere *not* under refurbishment these days!

https://www.disneyfoodblog.com/2025...ill-look-totally-different-in-just-one-month/

Interestingly enough, I found this link when searching for construction updates the other day - they seemed to be under the impression that everything would be wrapped up by the end of this month, which doesn't look to be the case. (Not that I think DFB is the most reliable source of information anyway.)

Also found this tonight (filmed today) - you can see the construction starting around 25:10.
 

Walkways Closed and Windows Covered as Refurbishment Continues at Disney’s Wilderness Lodge


A green barrier blocks a wooden walkway, with a sign indicating that the trail ahead is closed.
Scaffolding that has been standing outside of the main building for the Copper Creek Villas section of the resort has been changing locations throughout our last few updates. However, some areas of the resort are still blocked off to guests.


A rustic Wilderness Lodge-style building is partially hidden by tall trees and dense greenery on a cloudy day.Rustic Wilderness Lodge exterior with stone walls, large wooden beams, and lush surrounding greenery and trees.
Several guest rooms that were under refurbishment on our last visit now have curtains over the windows, indicating they may be close to completion.

A family sits outside Wilderness Lodge while others walk by on a cloudy day.A building under renovation at Wilderness Lodge with windows covered and green barriers blocking off the area.
Scaffolding has also been removed from this section of the exterior of the main building, although green barriers and some equipment still remain standing outside of the covered windows. The sidewalk area has reopened for guest use.


Large windows with opaque white coverings diffuse light in this dimly lit Wilderness Lodge interior with wooden beams.Scaffolding stands against Wilderness Lodge under renovation, with construction materials scattered nearby.
Other areas of refurbishment, which have expanded to the patio at the back of the building, are still underway. Scaffolding and plastic window covers have added to the back area of this smaller lobby space.

Indoor area with table and chairs; outside, a Sidewalk Closed Detour sign hints at a Wilderness Lodge update nearby.Two floor signs announce, Please pardon our pixie dust, sharing the latest Wilderness Lodge update.
Several A-frame signs placed in front of the doors read, “Please Pardon Our Pixie Dust – This Area is Being Refurbished for Your Future Enjoyment.” Compared to our last update, more white scrims have been added to windows and doors.


Worker on a ladder repairs a wooden balcony at Wilderness Lodge, viewed through large glass doors from indoors.
With a scheduled end of September 2025, only a couple of weeks remain for the planned refurbishment. Crews are hard at work trying to meet that deadline, though we will be interested to see if everything is completed by then.
 

















DIS Facebook DIS youtube DIS Instagram DIS Pinterest DIS Tiktok DIS Twitter DIS Bluesky

Back
Top Bottom