Work being done on the Beach?

That is sand that is being dredged from the lake to build the new beach on the other side of the Marina.
 

To the right of the Marina from the land side behind 100/200 loop, the entire area to the left of the Marina will change drastically for the new resort being started
 
To the right of the Marina from the land side behind 100/200 loop, the entire area to the left of the Marina will change drastically for the new resort being started
Why will the beaches be increased behind 100 and 200 loops for something that is being done over in the old River Country area?
 
Because for the next year to year and a half the beach will be closed for construction in that area. It will have the new DVC bungalows along where the current beach is.
 















Receive up to $1,000 in Onboard Credit and a Gift Basket!
That’s right — when you book your Disney Cruise with Dreams Unlimited Travel, you’ll receive incredible shipboard credits to spend during your vacation!
CLICK HERE













DIS Facebook DIS youtube DIS Instagram DIS Pinterest DIS Tiktok DIS Twitter DIS Bluesky

Back
Top