I see a lot of posts in here complaining that this is a "clone ride", and while it is taking a longer time than it should, a coaster of this scale is definitely not a clone ride. The layout is the same, but the supports have to be custom made to the plot of land, the concrete foundations all have to be engineered and poured, and any theming or interior electronics have to be built from scratch. The coaster portion of the ride is done and has had plenty of people on it, but I guarantee the theming inside isn't even close to finished. At this point the regular operating mode might not even be done, since that is usually one of the last things to be programmed along with ride faults. I worked as an engineer at a non-Disney theme park, and even when we built "clones" of another coaster it was still a massive construction project.