![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
Finally! This is FANTASTIC news! Here's hoping they can make it more like the refurbished amazing ride at Disneyland!
I am sooooo excited
Oh, I hope they're updating it like the one in Disneyland! If so, it will be well worth the wait.![]()
I read on another board that space mountain was left out of the 2009 Disney vacation dvd which was taken as "evidence" that the rehab was gonna begin this year?
anyone know if this is true? anyone seen the new DVD sans space mountain?
anyone know if this is true?

With the rehab scheduled for only 7 or so months, it will not be anything like the one at DLR. That rehab was a complete replacement of the ride within the building. This WDW rehab sounds like an updating of the theming inside the building, with probably an overhaul of the exisiting roller coaster.
The timeframe given is simply not long enough to remove the exisiting coaster, build the new one and get "bugs" worked out.
Not a problem, Guzzi. I'll just merge this thread into the other one.![]()
The Space Mountain rehab is now listed on the DIS's rehab page.
http://130.94.73.200/wdwinfo/rehab.htm
![]()
Hoping it won't stop on an incline, but I love that mountain. 
On the other hand, one of the reasons the Disneyland refurb took so long as I understand it is that it was an unplanned, sudden repair job. Thus, it took time to draw up the plans before any work could be done. Presumably, if the goal is to make the track similar to the one at DL, the plans are already made up and actual work can start immediately.
<- OMG! Does that little popcorn guy eat his arm, too?!!!!!!!!!!!!!By the dates noted, Space Mountain will be closed when we go to WDW in May. No loss for us as we don't ride SM anyway. Unfortunately, TTA will most likely be closed as well (we love taken a break in the afternoon on the TTA), and with SM closed, that will most likely increase the waits for SM and BTR as well.
We also love the TTA and hopefully they'll just put up some nice screens or something to block what is going on in SM and still have the TTA up and running. Paging Mr. Morrow... Mr. Tom Morrow....
...No loss for us as we don't ride SM anyway. Infortunately, TTA will most likely be closed as well (we love taken a break in the afternoon on the TTA), and with SM closed, that will most likely increase the waits for SM and BTR as well.
