I heard that WDW is trying to get the Snow White Mine Train Roller Coaster up and going by December. Anybody have any idea if this is still the case and what would be the possibility of any DVC previews in early November like we had with the new Fantasyland?
Thanks for the link. From the pictures, they are moving along but don't know about December opening. Alot of work done but all the inside work needs to be completed.
We also got to see the previews last October both on MNSSHP and then the DVC preview. Was great - no lines! We are going to be there from 10/31 to 11/10 this year so I am keeping my fingers crossed.
I heard that WDW is trying to get the Snow White Mine Train Roller Coaster up and going by December. Anybody have any idea if this is still the case and what would be the possibility of any DVC previews in early November like we had with the new Fantasyland?
Those questions are impossible to answer 6 months ahead of time. Biggest variable is ride testing. Not only is it a brand new attraction (rather than a clone of something Disney has built at another park), it's also a new ride system. Anything can happen during testing.
Back in the '90s, test track opened 18 months late due to issues that arose during construction and testing. Wouldn't expect anything that extreme here but delays of weeks or months are certainly possible. Estimated opening dates and previews won't be considered until they are further along.