ROFR Thread April to June 2025 *PLEASE SEE FIRST POST FOR INSTRUCTIONS & FORMATTING TOOL*

I mention BLT because most of our points are there. OKWE because our direct points are there and I wouldn't mind having more okw points to get GVs, although the dues are unpleasant. We have never been to Aulani. I bought them because I got them for $70 pp when disney took every contract I negotiated (think it was 10+ contracts). We tried to go in AUL in 2020 for our 20th but didn't think being separated from our kids by land was smart. This year we were going to Cali, then Aul, then Tokyo and HK for our 25th but now we have to book outside of USA so who knows when we will get to AUL. With that info as background, would you still go SSR?
If you bought aul for $70 pp why swap for SSR that is listed for more?
 
But I'm in the middle of finishing my basement so it's probably a no from me. But that doesn't stop me from checking on DVC deals every day

I feel this. We got water in part of our basement last summer. We had everything waterproofed and regraded part of our yard. But we still need to get walls and flooring back up in the room where the water came in. So knowing that project is on the horizon, I'm resisting the urge to add more DVC right now. But it's hard because a contract for almost exactly what I want came on the market a few days ago (VGC.) I'm going to be responsible though. 😁
 
I mention BLT because most of our points are there. OKWE because our direct points are there and I wouldn't mind having more okw points to get GVs, although the dues are unpleasant. We have never been to Aulani. I bought them because I got them for $70 pp when disney took every contract I negotiated (think it was 10+ contracts). We tried to go in AUL in 2020 for our 20th but didn't think being separated from our kids by land was smart. This year we were going to Cali, then Aul, then Tokyo and HK for our 25th but now we have to book outside of USA so who knows when we will get to AUL. With that info as background, would you still go SSR?
The AUL market is REALLY flooded right now and you have commissions, estoppel, and closing costs on a new contract…..
 

I feel this. We got water in part of our basement last summer. We had everything waterproofed and regraded part of our yard. But we still need to get walls and flooring back up in the room where the water came in. So knowing that project is on the horizon, I'm resisting the urge to add more DVC right now. But it's hard because a contract for almost exactly what I want came on the market a few days ago (VGC.) I'm going to be responsible though. 😁
In other words…. “My spouse won’t let me” 🤣
 



















DIS Facebook DIS youtube DIS Instagram DIS Pinterest

Back
Top