So do we know when the construction walls come down at DCA where the tracks are going in? I know it doesn't start running until 2012 but I doubt it takes that long to lay track. It looks like they've gotten most of it done.
I've been wondering the same thing. I'm really hoping to enjoy CA without all the construction walls for a change. It would be really nice if most of the walls were down for our upcoming trip.