Nice to see they're refurbishing the unit
That doesn't surprise me, since they are the cheapest rooms, they would likely be the last to get renovated.
We are going next August and we have stayed at BWV 3x... We may stay there again but are hoping to be able to get a standard view because of the points.. Do you know where the HA rooms are located in the standard view section? Are they far off the elevator? We have always had a pool view which is great, overlooking the main pool and its right off elevator. If we are able to get the standard view we need a short walk from elevator.. I just dont want to book it if we can than realize it's too far away. THanks.We arrived very late last night. I did a hike around the hallways this morning to see what is done. ALL BW VIEW ROOMS ARE FINISHED! We are very lucky because our room was just completed a few days ago. Since it is the only BW view HA 1 bedroom, we would have been displaced had it not been completed.
Regarding pool/garden view rooms: ALL ROOMS THAT ARE DOWN THE HALLWAYS THAT ARE STRAIGHT AHEAD AS YOU EXIT THE ELEVATORS ARE DONE EXCEPT FIRST FLOOR. On the first floor (the rooms that you get to by going outside and across the breezeway), rooms 1001-1027 are done (rooms farthest down the hallway). The rooms that are in the hallway closest to the breezeway are not done. Also, the rooms on 5th floor across from the standard view rooms are done. (These rooms are to the right as you exit the elevators.)
Regarding standard view rooms: only 5th floor is done. Crews are working on 4th floor, so a 3rd floor room would be very noisy.
Update 10-18-15 on 4th floor standard wing progress:
We are still here and I just walked over to check out the 4th floor standard wing. Even though the door is open, construction workers sent me out. I could see them working on painting doors (on a Sunday, so they are really hurrying to get this done). Since the new hallway carpet is down, I would assume they are doing finishing touches but the rooms will have to be cleaned and stocked. Maybe in a couple of days this wing will be ready.
Update 10-18-15 afternoon on 4th floor standard wing progress:
After the workers left I walked down the hallway. There is still significant painting to do and the hallway that turns right towards the quiet pool is not even carpeted. So it may be more than a couple of days before this wing is ready. Also, there is still a bunch of equipment on the lawn outside of the standard wing doing exterior work.
great. thanks. i wonder if they are in same spot just 2nd floor. it would make sense because it would be facing back of leaping libations.We have only stayed in BW view HA units but others have posted that the standard view HA rooms are close to the elevator on 2nd floor.
Perhaps but I think it is more likely facing the driveway. But I have never stayed in a standard HA so I am only repeating what others have posted.great. thanks. i wonder if they are in same spot just 2nd floor. it would make sense because it would be facing back of leaping libations.
great. thanks. i wonder if they are in same spot just 2nd floor. it would make sense because it would be facing back of leaping libations.
Don't count on it. I requested village green on my trip a couple of years ago and ended up with pool view close to the elevator. I actually liked it.
Any ideas if they have to relocate folks due to renovations?
We're in a standard view in less than 2 weeks.