We arrived very late last night. I did a hike around the hallways this morning to see what is done. ALL BW VIEW ROOMS ARE FINISHED! We are very lucky because our room was just completed a few days ago. Since it is the only BW view HA 1 bedroom, we would have been displaced had it not been completed.
Regarding pool/garden view rooms: ALL ROOMS THAT ARE DOWN THE HALLWAYS THAT ARE STRAIGHT AHEAD AS YOU EXIT THE ELEVATORS ARE DONE EXCEPT FIRST FLOOR. On the first floor (the rooms that you get to by going outside and across the breezeway), rooms 1001-1027 are done (rooms farthest down the hallway). The rooms that are in the hallway closest to the breezeway are not done. Also, the rooms on 5th floor across from the standard view rooms are done. (These rooms are to the right as you exit the elevators.)
Regarding standard view rooms: only 5th floor is done. Crews are working on 4th floor, so a 3rd floor room would be very noisy.
Update 10-18-15 on 4th floor standard wing progress:
We are still here and I just walked over to check out the 4th floor standard wing. Even though the door is open, construction workers sent me out. I could see them working on painting doors (on a Sunday, so they are really hurrying to get this done). Since the new hallway carpet is down, I would assume they are doing finishing touches but the rooms will have to be cleaned and stocked. Maybe in a couple of days this wing will be ready.
Update 10-18-15 afternoon on 4th floor standard wing progress:
After the workers left I walked down the hallway. There is still significant painting to do and the hallway that turns right towards the quiet pool is not even carpeted. So it may be more than a couple of days before this wing is ready. Also, there is still a bunch of equipment on the lawn outside of the standard wing doing exterior work.
Regarding pool/garden view rooms: ALL ROOMS THAT ARE DOWN THE HALLWAYS THAT ARE STRAIGHT AHEAD AS YOU EXIT THE ELEVATORS ARE DONE EXCEPT FIRST FLOOR. On the first floor (the rooms that you get to by going outside and across the breezeway), rooms 1001-1027 are done (rooms farthest down the hallway). The rooms that are in the hallway closest to the breezeway are not done. Also, the rooms on 5th floor across from the standard view rooms are done. (These rooms are to the right as you exit the elevators.)
Regarding standard view rooms: only 5th floor is done. Crews are working on 4th floor, so a 3rd floor room would be very noisy.
Update 10-18-15 on 4th floor standard wing progress:
We are still here and I just walked over to check out the 4th floor standard wing. Even though the door is open, construction workers sent me out. I could see them working on painting doors (on a Sunday, so they are really hurrying to get this done). Since the new hallway carpet is down, I would assume they are doing finishing touches but the rooms will have to be cleaned and stocked. Maybe in a couple of days this wing will be ready.
Update 10-18-15 afternoon on 4th floor standard wing progress:
After the workers left I walked down the hallway. There is still significant painting to do and the hallway that turns right towards the quiet pool is not even carpeted. So it may be more than a couple of days before this wing is ready. Also, there is still a bunch of equipment on the lawn outside of the standard wing doing exterior work.