Here's an update on the Kidani Village construction project.
Current Status: Half of the resort is undergoing a major refurbishment, specifically the section to the right of the lobby and closest to Jambo House. The section is closed just passed the laundry room. The arcade and community hall are open.
Materials are currently staged in the garage beneath this area, and the covered parking underneath this section is closed. This part of the resort will be completed and opened in phases. The focus is on the section nearest to the lobby first. The 4th and 5th floors of this section are nearing completion, but it is unclear whether they will open separately or wait until all floors are finished. The remaining half of this section will follow afterward.
Renovations: This update will include new paint, fixtures, appliances, and furniture. For flooring, the studios and one-bedroom units will feature Luxury Vinyl Plank (LVP) throughout. In dedicated two bedrooms, LVP will only be installed in the living areas of the two-bedroom units and carpet in the bedrooms. I did not inquire about the Grand Villas, but they will likely have a combination of LVP and carpet as well.
I did not ask about the updates regarding the Murphy beds, but this feature has been included in all previous major refurbishments.
All of the exterior windows are currently covered with dark plastic, preventing visibility into the construction areas.
I took a few photos but the consturction site is restricted so I could’t get close.
Current Status: Half of the resort is undergoing a major refurbishment, specifically the section to the right of the lobby and closest to Jambo House. The section is closed just passed the laundry room. The arcade and community hall are open.
Materials are currently staged in the garage beneath this area, and the covered parking underneath this section is closed. This part of the resort will be completed and opened in phases. The focus is on the section nearest to the lobby first. The 4th and 5th floors of this section are nearing completion, but it is unclear whether they will open separately or wait until all floors are finished. The remaining half of this section will follow afterward.
Renovations: This update will include new paint, fixtures, appliances, and furniture. For flooring, the studios and one-bedroom units will feature Luxury Vinyl Plank (LVP) throughout. In dedicated two bedrooms, LVP will only be installed in the living areas of the two-bedroom units and carpet in the bedrooms. I did not inquire about the Grand Villas, but they will likely have a combination of LVP and carpet as well.
I did not ask about the updates regarding the Murphy beds, but this feature has been included in all previous major refurbishments.
All of the exterior windows are currently covered with dark plastic, preventing visibility into the construction areas.
I took a few photos but the consturction site is restricted so I could’t get close.
Attachments
-
IMG_2011.jpeg124.2 KB · Views: 19 -
IMG_2015.jpeg131.2 KB · Views: 19 -
IMG_2016.jpeg170 KB · Views: 19 -
IMG_2017.jpeg243.6 KB · Views: 15 -
IMG_2019.jpeg235.7 KB · Views: 15 -
IMG_2020.jpeg336.7 KB · Views: 16 -
IMG_2021.jpeg254.9 KB · Views: 17 -
IMG_2022.jpeg276.5 KB · Views: 18 -
IMG_2023.jpeg201.7 KB · Views: 18 -
IMG_2024.jpeg227.2 KB · Views: 17