IrishNYC
DIS Veteran
- Joined
- Nov 19, 2014
- Messages
- 2,814
Peter Pan, followed by IASM. They are so quintessentially Disney.
We had a FP set up for PP, but having had breakfast at CRT we got right on PP without it, then used that FP as a rolling FP to chase the next ride we wanted until we hit the time for our next actual FP. In other words, when we got on PP without the FP, I changed that FP to IASM at about 9:15. When we got on IASM in standby, I rolled that FP to Haunted Mansion. We did SB on HM, so I rolled it to BTMRR at about the time I thought we'd get there. Did SB on BTMRR, so I rolled it to Pirates. We rode Aladdin, then did SB on POC, and rolled the FP to something later in the afternoon, as we were running into the time for our next FP we had set up and needed to use on SDMT. It was a really great use of the FP.
We had a FP set up for PP, but having had breakfast at CRT we got right on PP without it, then used that FP as a rolling FP to chase the next ride we wanted until we hit the time for our next actual FP. In other words, when we got on PP without the FP, I changed that FP to IASM at about 9:15. When we got on IASM in standby, I rolled that FP to Haunted Mansion. We did SB on HM, so I rolled it to BTMRR at about the time I thought we'd get there. Did SB on BTMRR, so I rolled it to Pirates. We rode Aladdin, then did SB on POC, and rolled the FP to something later in the afternoon, as we were running into the time for our next FP we had set up and needed to use on SDMT. It was a really great use of the FP.

Only to discover its under refurb when you go. Boo hiss. 


