Thank you. Wow. This scaffolding has been up in that same spot since middle of June!Not there, but someone posted this picture on FB today and stated the outdoor seating is still closed.
View attachment 984247
Ahhhhhh good catch, thank you! That really shocked and confused me for a bitThat's what I thought at first glance but it's "Brother Bear"
Moose characters Rutt and Tuke are laying across the mammoth.
View attachment 984067
Wanted to update:Not there, but someone posted this picture on FB today and stated the outdoor seating is still closed.
View attachment 984247
Thank you for this update! We are there July 25 for a few nights !Wanted to update:
A poster on FB reported a small section of the outdoor seating has opened up.
Yes if you are staying in the Copper Creek DVC side of the main lodge but it is almost done. Did you check all the pics that @mrsap posted. The last couple show the scaffolding is mostly down.Is the a chance that you may get a room that has construction equipment outside your balcony?
What has Disney done if you have a balcony room, but you can’t really use it because scaffolding is in front of the balcony?Yes if you are staying in the Copper Creek DVC side of the main lodge but it is almost done. Did you check all the pics that @mrsap posted. The last couple show the scaffolding is mostly down.
Note: not to say that they could not find a reason to add scaffolding if they need to fix something but normally they don't put it up, take it down, and then put it back up again.
Dave
Nothing, and no one has indicated you can't use the balcony except when they leave a flyer, and place a sign on your balcony door. Only thing to prevent you from unitizing the balcony would be when they are standing on your Balcony to paint. And that is only between 9 AM - 5 PM. They can put up, and remove the scaffolding in a couple of days.What has Disney done if you have a balcony room, but you can’t really use it because scaffolding is in front of the balcony?
We have stayed at WL when there was scaffolding in front of our balcony. The scaffolding is set up in a way that doesn't block the use of the balcony. It is annoying but not a deal breaker for us.Is the a chance that you may get a room that has construction equipment outside your balcony?
The Red Flag boats run between the WL, and MK. They have (2) type of boats. Smaller launches, and bigger Cruisers (enclosed Cabin) with outdoor seating to the front, and rear of the main cabin. They normally alternate the boats on the Red Flag line.Staying at WL for the first time next month and will have 2 ECVs. Is it better to take the bus or boat to MK?
The large boats will take ECV's easily. You would just drive them on and drive them off. The buses take a lot longer to load and unload. Either one would work. There is a limit of two ECV's on a bus. The boat would hold a lot of ECV's.Staying at WL for the first time next month and will have 2 ECVs. Is it better to take the bus or boat to MK?
Excellent—ty is is what we were wondering. We’ve taken the ECVs on one of the large boats when we went to Hoop Dee Doo. Am I correct that they alternate between the large and small boats in the morning? Also, do you happen to know when they start running for early entry?The large boats will take ECV's easily. You would just drive them on and drive them off. The buses take a lot longer to load and unload. Either one would work. There is a limit of two ECV's on a bus. The boat would hold a lot of ECV's.
If I was using an ECV then I would take the boat.![]()
No the 3rd floor rooms are not in the inventory. They have done each floor (1) at a time starting with the 7th and working their way down. Currency the entire 3rd floor is closed on the CCV (South Side of WL). Floors 4-7 are done.3rd floor closed? Does that mean they are renting those rooms or does it mean those are closed for several hours?