This still has me curious, as while acquisitions can take a long time, since it had become quiet. I found a brand new study that was completed in November with recommendations for 535 from I-4 South towards 192 ........ a heavy traffic area ........ and this is a big project too.
Part of me was the I-4 project close and in Orlando Downtown is still such a nightmare, potentially this project was tabled or put on delay. So I started some back door googling and finally came upon this.
Map we have seen but ... the article seems to back that this is on delay until the central (Ultimate) project is done.
Jan 29, 2018
The above photo is what FDOT calls their "recommended alternative" for the I-4/SR 535 interchange upgrade project, which is listed as a part of the
I-4 Beyond The Ultimate project. The I-4 Ultimate Project is a project to expand I-4 and add express lanes to the road through Downtown Orlando, with completion expected in 2021.
The Beyond The Ultimate Project will expand I-4 through the northern and southern suburbs of Orlando once the main project is completed, with construction expected to begin around 2022. For a better look at the interchange reconfiguration map, you can download the original high resolution pdf
here. Originally, FDOT had three alternatives for the reconfiguration of this interchange, called
Alternative 1,
Alternative 2, and
Alternative 3. In those original plans, Alternatives 1 and 2 would have only effected the portion of the Crossroads plaza closest to I-4 (with Red Lobster, Taco Bell, Johnny's Hideaway, and the mini golf course being the only casualties). Alternative 3 would have not had any effect on the plaza at all, and is the reconfiguration plan the tenants of the plaza are still pushing for.
http://albertsonsfloridablog.blogspot.com/search/label/Gooding's