Does anyone know how the renovation is going? What floor are they up to now? Thanks!
 
I saw a report that they've been going top to bottom and have completed 6-16.
 
When we were there in early June, they were working on 8 (the elevator was blocked for 8) and part of 7. Floors 15 and 16 and 1 - 6 had not been done. That was a month ago, I don't know if they finally got to work on the top two floors. We were on 9 and were the first to stay in our villa after the remodel, they were still working on the villas on the north end of the 9th floor. And that is when we found out that the studios were not getting sheers.
 
Thanks for the update. Does anyone know if there are thos tiny bugs called no see ums or midges at bay lake? Two years ago we were there in August and our room on the 3rd floor had those tiny bugs everywhere on the ceiling and they said that it's normal. We ended up changing rooms but it's gross to see so many of those tiny bugs on the bed as well. It was not bed bugs so that was a good thing.
 

When we were there in early June, they were working on 8 (the elevator was blocked for 8) and part of 7. Floors 15 and 16 and 1 - 6 had not been done. That was a month ago, I don't know if they finally got to work on the top two floors. We were on 9 and were the first to stay in our villa after the remodel, they were still working on the villas on the north end of the 9th floor. And that is when we found out that the studios were not getting sheers.
We are at BLT now and our room on the 8th floor has been renovated. I love the updates. I see the workers on the 5th floor now.
 