When we were there in early June, they were working on 8 (the elevator was blocked for 8) and part of 7. Floors 15 and 16 and 1 - 6 had not been done. That was a month ago, I don't know if they finally got to work on the top two floors. We were on 9 and were the first to stay in our villa after the remodel, they were still working on the villas on the north end of the 9th floor. And that is when we found out that the studios were not getting sheers.