- Joined
- Aug 25, 2007
- Messages
- 5,164
On Feb 7, DVC declared the remaining Jambo House units that will be in AKV. This was recorded on Feb 11.
The final units are 11 2-BR lock-offs and 2 dedicated studios.
Phase 18 - 2 two-BR SV units
Phase 18A - 2 two-BR SV units
Phase 19 - 2 two-BR SV units
Phase 20 - 2 two-BR SV units
Phase 21 - 2 two-BR SV units
Phase 22 - 1 two-BR SV units, 2 ded Studios
AKV inside Jambo House has all been declared. Next up - Kidani!
The final units are 11 2-BR lock-offs and 2 dedicated studios.
Phase 18 - 2 two-BR SV units
Phase 18A - 2 two-BR SV units
Phase 19 - 2 two-BR SV units
Phase 20 - 2 two-BR SV units
Phase 21 - 2 two-BR SV units
Phase 22 - 1 two-BR SV units, 2 ded Studios
AKV inside Jambo House has all been declared. Next up - Kidani!