Progress:
All prototypes completed.
For Smackerel: Cut the 8x8, photomats, and topper mats
cut 8x8 for 2 other groups
I plan to switch over to elements to get the prototypes done.
I hope to be able to get some of the simple cutting done during the day when the kids are otherwise occupied. I think I need to allow a week per letter to get it all done in time. I hope it goes faster.
After my prototypes for both swaps are complete, I am going to make a shopping list. I think I will need a bunch of xyron re-fills!
All prototypes completed.

For Smackerel: Cut the 8x8, photomats, and topper mats
cut 8x8 for 2 other groups
I plan to switch over to elements to get the prototypes done.
I hope to be able to get some of the simple cutting done during the day when the kids are otherwise occupied. I think I need to allow a week per letter to get it all done in time. I hope it goes faster.
After my prototypes for both swaps are complete, I am going to make a shopping list. I think I will need a bunch of xyron re-fills!