tinksdad
It's a Good day to get Wet!
- Joined
- Jul 30, 2002
- Messages
- 6,374
We all have to obey the "Boss"scuba diver said:It's all about delegation. Which is why I have to head home and cook dinner. Sharon delegated!![]()

We all have to obey the "Boss"scuba diver said:It's all about delegation. Which is why I have to head home and cook dinner. Sharon delegated!![]()
tinksdad said:We all have to obey the "Boss"![]()
DVCcruise said:That's exactly why my children don't know about our cruise yet! I've messed up a few times in front of them, but no one has caught on yet. We're saving the surprise until Christmas. It'll be a great surpise.![]()
tinksdad said:I'm thinking a bit closer. Mostly the fountain, with the sign above the door in the frame.
I promised Lisa a t-shirt on the "dive day" we had one the last Epcot dayand forgot to take one when we were there after the cruise.
More than that.kikipug said:See... good things happen when you obey "the Boss"... you get a TOP!!
Thank You!!scuba diver said:I understand and will get it taken care of.
Great Info! I'll have to look into that, thanks for the heads up. 3.5mil might be nice. I've got a 3/2 and have to admit at times it's not enough.scuba diver said:Kevin, I just order Matt's LiquidFit wetsuit. They are having a sale for the kids. A full length 3.5 mil hyperstrech with a 3.5 sleeveless jackets for cheaper than I can order off the rack. They are trying to get rid of their copper color. Matt does not care about the color so that is the way we are going. If you can ever get by with a 3.5 mil you might want to talk to them.
TiggerInNY said:We're pushing out the back of the house(kitchen and dining room) and going up with a 4th master bedroom suite. Please say a prayer for me. I don't have much patience to start off with.
Anyway.....Let's make it a great day out there. I love reading all your posts. I feel like I know you, but never met any of you....yet!!! Can't wait for that to happen.
TTFN,
TiggerInNY
Maria![]()
How exciting!!TiggerInNY said:Tinksdad - my husband is a Union plumber and a lot of his friends are going to be doing most of the work. My husband is very handy and all the other guys are all union workers. So, it's us as the contractor. We know exactly what we want and the architect did a great job portraying it on the blue prints. We have a side-to-side split and are going out 22' with the kitchen/dining room and adding a family room behind the dining room and putting the master suite above. Not extending all the way out, of course. Otherwise we would have an enormous, way over sized bedroom. It's big enough the way it is on the prints. 17 x 23' Not including the bathroom. So, if you're in the NY area this spring/summer/fall pop on in and I'll show you around the construction site.
My oldest son, age 9, is going to be playing little league and then travel ball which I thought would be a great idea, just to get me out of the house. Any suggestions are welcomed.
Have a great day.
TTFN,
Maria
tinksdad said:How exciting!!Kitchens are the hardest part of the home to remodel. Since it's the "hub" of the house. The family is at odds when the hub is down.
Man, I guess. Did the remodeler get out of the drive way before the hurricane?kikipug said:Our kitchen remodel was completed about 6 hours before Hurricane Charley rolled into town... talk about chaos!!! I still can't find some of the things I put away!!!!
tinksdad said:How exciting!!Kitchens are the hardest part of the home to remodel. Since it's the "hub" of the house. The family is at odds when the hub is down.
WHAT A DRAG!!whnim64 said:WOW, sharing a T.O.P. with tinksdad!
We had an unintentional kitchen remodel a year and a half ago. We came home from a long weekend on Veteren's Day 2003 to find that our upstairs bathroom sink had a hot water line come loose. We had 3 inches of water on our kitchen floor (beneath the bathroom) and the ceiling was falling down. The water had also soaked through the kitchen floor into the basement. It took us until Valentine's Day 2004 to get our kitchen back. We went ahead and gutted it and did some extra work. Even though it's been a year, DH just got around to putting some of the trim up last weekend and still has some baseboard to install. I can live with those little things, though. Best of luck on the remodel.
tinksdad said:Great Info! I'll have to look into that, thanks for the heads up. 3.5mil might be nice. I've got a 3/2 and have to admit at times it's not enough.![]()
Going to LiquidFits site now....