Yep, just finished. After a very long day which is going to be many more long days before we sail. The company had use with permission of some property surrounding theirs. Well it was sold and the new developer has a major attitude and is doing everything possible to push us out. Not gonna happen. We lose the main driveway behind the building and the employee parking lot. But this lovely fence on the right appeared on Monday, right down that rear driveway.
But we were prepared for it, the two semi trailers you see were used for external storage, one for consumables(hangers, poly bags, etc..) and the other was equipment/parts storage. I've spent the past few months building a second floor above my workshop to store all the parts and we've emptied both trailers. Today was the big day, we finally found a working deal to get rid of them, with the help of two of these.
Now, finally both are gone, I've erected a temporary barrier out the the RR ties that the trailers were resting on, as there's a covered pit behind the ties I don't want anyone driving over and that big grey thing is our natural gas meter.
That's that, but I still have alot to do inside the building rearranging to make a very underutilized room into a storage room, including cleaning out onw of our stores that used to be a plant so I can use the back for long term storage as well. And two more abandoned vehicles on the corner of our property, but they're out of the way for now. All in the next 2 weeks!
You'll be able to tell who I am as the roll me onboard on the strecher...