JENKATT SAID:
"One last thing, where is Peter??? (Hygeine) He usually does the introductions..."
Peter IS Very Busy Building a $ 200 Million Dollar Hotel...We did have a $300,000 extra this week LoL.....
Next Door To The New Convention Center in Boston .. 790 rooms
But We are Just doing The earth work Now Like Driiving Piles/ Cassions
Since South Boston is All Clay, Bedrock is Down on average 120 Feet..
So we Have 2 pile Driving Rigs Going and 440 piles to drive 120 feet into the ground.. Well I tell them Where to put these piles
Since im A Surveyor.. oh Yeah It is Like the Swan and Dolphin
Owned by WESTN ....
I Want my share Lol, UNLIMITED OT !!!
Since I Do not GET Paid Vacations I need to make up the time I will be missing While Im on my 7 day cruise in October .. Since Im a member of The I.U.O.E Local 4 I have to Work 1200 hours a Year in order to recieve a Pension credit and Health insurance for the Following year We pay for it a Year in Advance ..
And since I did not Work Until MAY of this year I will Work every hour I can NOW to make sure I hit 1200 before the end of the year.. my buddy Who im working with did not start work until
July So we are playying Catch up for Him Big time We figured it out and He has to Work every week until end of the year plus 187 Hours , So that is how many hours of ot we need before the end of the Year... Lol
I think the Guys(Suffolk Construction) That Im working for Are Very Happy with the Way things are going So far...